bar

D8.3 – ASTRABAT Website

This document reports on the development of the ASTRABAT website (https://astrabat.eu/). In particular, it describes its structure, layout and purpose as a communication and dissemination channel for project contents. The document also outlines the content management strategy and the approach to monitor the website performance over the course of ASTRABAT. Read More

D8.2 – ASTRABAT presentation video and flyer

This deliverable reports on the development of the ASTRABAT presentation video and flyer. It presents the distribution strategy adopted to disseminate the two products across the project stakeholder groups. The document also describes how the video and the flyer will be incorporated in the methodology developed to assess the overall… Read More

D8.1 – Communication and dissemination plan, initial report

This document describes the communication and dissemination strategy developed for the ASTRABAT project. It outlines the key elements of the communication and dissemination strategy, which include: the targeted audiences (WHO), the key messages to address them (WHAT), the tools and channels employed (HOW), the timing of the planned activities (WHEN)… Read More

D7.5 – Certification and standardization for ASSB in 2020

In this deliverable we review the main regulations and standards related to Li-ion cells – i.e. regulatory requirements to facilitate international trade, to integrate the battery in electric and hybrid electric vehicle and regulation governing the transport of the battery cells and modules. This review sets up a short overview… Read More

D2.5 – Analysis of battery requirement for vehicle applications

This deliverable reports the vehicles’ requirements for power system. The document describes the simulation of performance preferences and requirements (continuous C-rate, power, voltage level, peak C-rate, specific energy, etc.) for battery electric vehicle (BEV). The battery requirement for the vehicle is also anlysed. The EUCAR test protocols, namely Hazard Level… Read More

D2.4 — Test specifications

The ASTRABAT project main goal is to develop a new generation of batteries for electric vehicle battery storage with a solid electrolyte. This report describes the protocols for material characterization (polymers, ceramic, electrolyte), and electrochemical test validation (comprising safety tests) that will be used in ASTRABAT to characterize materials… Read More